final view
final view of the project
IMG_5422
demolition till 22nd april-15
IMG_5956
site after demolition
IMG_2596
pest control during foundation stage
IMG_2883
short columns ready
IMG_3205
2nd set of column concreting
IMG_6050
UG sump for water storage
IMG_0183
G Floor concreting in progress on 26th Jan 2016
IMG_0195
Steel reinfocement for G Floor
IMG_0281
curing in Grd floor roof
IMG_0282
curing in G Floor roof slab
water-tan-and-terrace
water tank and Head room
img_0992
outer plastering
IMG_5650
pressed tiles terrace laid
IMG_5867
pressed tiles laid in terrace and checked the slope